Piling Technology for centrifugal prestressed pile
Category : Pilling Categories - 23/01/2014Centrifugal restressed piles: Centrifugal prestressed piles are used very popular in recent years, in the civil construction projects, industrial in Vietnam, can substitute for the type of load other piles:…
Advantages and disadvantages of bored piles construction
Category : Pilling Categories - 17/01/2014Each solution pile and pile construction currently used have a certain range of applications accompanied by the advantages and disadvantages pile is also not an exception. The advantages and disadvantages…
The construction step of bored pile (Part 2)
Category : Pilling Categories - 11/01/2014After checking the depth of holes drilled in step 3, we carried out the next steps in the construction process bored piles as follows: 4. Working reinforced Reinforcement work processing…
The construction step of the bored pile
Category : Pilling Categories - 02/01/20141. Layout diagram drilling location – Each drill is arranged in a certain area to avoid entanglement in the construction work. – To arrange the order drill from the inside…
The preparation of bored pile construction
Category : Pilling Categories - 27/12/2013Pile is a kind of reinforced concrete piles are widely used today because it is the foundation solution has many advantages in terms of design, based on geological data designer…