Requirements for shuttering work

Requirement of shuttering work and scaffolding is to be designed and constructed so that the correct location of the structure, proper geometry of the structure, ensuring rigidity, stability, ease of installation and construction dismantling, and not interfere with the installation of rebar and poured, concrete vibrator. Construction villas, hotels … or large projects, this task has been to ensure proper technique.

Yeu-cau-trong-cong-tac-cop-pha

 

Prior to the erection contractor conducted encasements, consulting engineers make to the quality of the contractor should require encasements designed with material types used, referring to measures lead and coordinate high degree of structural explanations and calculations required endurance test, the stability of scaffolding, shuttering. In the detailed design needs to cover up the order and sequence assembly dismantled.

With the shuttering used for nails, check the load cases different effects: while not pour concrete when pouring concrete.

Formwork must be sealed so that the transplant process placing and compacting concrete, cement water does not leak out structural loss and protect concrete after casting. Prior to installation of reinforced encasements should check the tightness of the slot encasements. If there is a little gap, inserting interstitial need paper or wood chips soaked in water to keep a low profile.

Shuttering and scaffolding needed machining , erection place in design, shape design, ensure the size of the tolerance range. Check the correct position must be based on the measurement system outside the landmark building that leads to the location of works. If using measures derived from the project must demonstrate that ensures accurate positioning without Accumulated prey.