Construction eco-tourist complex and resort in Nha Trang

Under the approved plan, Nha Trang will conduct building of eco-tourism, the resort is planned component parts of the island and the sea in the region: Bai Ran, Bai Tre, air miles, Vung Ngan and Bich Dam of Hon Tre Island, Nha Trang with an area of ​​556.59 hectares and 926.53 hectares of ground sea islands. The objective of planning to build a tourist complex ecological resort, conference, workshops, entertainment, …

quy-hoach-nha-trang

Overview landscape architecture space is planned according to the principles of open and leaned against the mountains to the sea , construction planning functional areas on the basis of landscapes and natural terrain . The building was built mainly dispersed , not the construction of a volume too large . Friendly forms of architecture with nature .

Hon Tre Island is planned into 5 main areas according to the boundaries inherent planning , namely :

Coral Beach Area : 828.721m2 plan study area along 1.412.000m2 sea island will be the design and construction of a mixed area hotels , villas and 5 star standard resort .

Bamboo Beach Area : Research 1.193.983m2 land planning and 2.967.185m2 scope island marine area .

Zone mileage : Research 2.266.106m2 planning 3.391.396m2 land and sea island with nature as the resort , the hotel combines nursing services , health care .

Ngan areas : research planning and 956.401m2 660.524m2 ground sea islands .

Finally Bich Dam area ( land 616.566m2 and 534.287m2 sea island planning study ) , it is expected the construction site for the purpose of resettlement for residents across the island of Hon Tre with items the infrastructure to serve the needs of residents living after resettlement in this area .