Pour concrete garage wall – V6-B9 Buildings Nguyen, Nha Trang

V6-B9 works under the Sea Villas and travel services Nguyen was signed between JSC Consulting and Construction Management CMC investor is Ms. Nguyen Thien Ly (Binh Thanh District, Ho Chi Minh City) with crude construction items. Construction work began on 08/29/2013.

cong-trinh-v6b9-anh-nguyen

After blasting out of time to prepare for the construction work, the last date 09.26.2013, CMC has conducted concrete garage wall with a height of 2m8, using a total of 14.5 m3 of concrete. Concreting work is conducted in accordance with the contract schedule and serious place, ensuring technical standards and work quality.